Description
Description of Work: 4020m long headrace tunnel with 4.15m finished diameter, two different adits of length 189m and 100m. 58m high and 10m finished diameter of surge shaft.
Capacity : 20 MW
Details
| Location: Parbat, Nepal | |
| Surface Area: | |
| Year: | |
| Value: NPR. 1,265,712,906.00 | |
| Categories: Completed Projects, |